What the yard needs before a load moves
A crusher can make several sizes in a day. It cannot read a site engineer’s mind. The docket exists so the pile that grows overnight is the pile the lorry is meant to carry.
Send four things: the grade from the book, an approximate tonne count, where the stone has to land, and the day it has to be there. If the pour is 20 mm, write 20 mm. Do not write “metal” and hope the yard picks the right deck.
A filed docket is a request. The yard confirms it. For a same-day load, call Kanivenarayanapura as well as filing the form. The phone numbers on this site are the same desk.